Citroen Winks at Construction Delays with an Epic Ice Ballet Choreographed by BETC Paris

Citroen Winks at Construction Delays with an Epic Ice Ballet Choreographed by BETC Paris

Apr. 18, 2024

When you have a utility vehicle that’s tailored to your every need, it feels more like a partner than a car. And that’s exactly the starting point for BETC’s new epic spot for Citroën’s Professional Range, where a utility worker performs a surreal ice ballet in perfect harmony with his Citroën ë-Berlingo.

The idea pushes the symbiosis between man and machine to its absolute, absurd, metaphorical limit, bucking the category norm, and returning to the sort of epic comedy Citroën was known for for years.

Of the campaign BETC President and Chief Creative Officer Stephane Xiberras said:

“Citroen is not a car brand like any other, so why do the same advertising as all the others.”

 

The film’s signature “Apologies if work is a bit behind schedule” is a small wink at the common misconception that when there are delays on worksites, it’s somehow the workers’ fault. Here, BETC and Citroen offer their most tongue-in-cheek rebuttal: clearly, the workers have been off ice-dancing with their ë-Berlingos.

The film is set to Joe Cocker’s Iconic “Up Where We Belong” - a love-song that eloquently captures the feeling between the worker and his car - and takes place in a frozen dreamscape.

Making the film was no easy feat, with cast, crew and cars traveling to Helsinki Finland in search of masses of ice large and strong enough to bear the weight of the vehicle. The commercial was produced by Zauberberg and directed by Max Malkin, with post-production by Berlin based bEpic.

The campaign supports the launch of Citroen’s new fully electric professional range, comprised of the ë-Berlingo, ë-Jumper, and ë-Jumpy, and will be broadcast on TV, digital and social media, both in France and internationally.

Related News

Aug. 30, 2024

"This Land is Calling" Launches in Five Countries, Revealing Saudi's Enigmatic Appeal

Saudi Tourism Authority and BETC Paris Unveil "Saudi Odyssey," a Global Campaign by Director Antoine Bardou-Jacquet

Jul. 19, 2024

Ad of the Day | This Summer, Heetch is Promoting its Biggest Competitor: Uber

To guarantee its complete availability to Parisians during the summer, the ride-sharing brand Heetch is pushing millions of tourists to use Uber

Jul. 01, 2024

For the Everyday Heroes, it is Heinz or Nothing!

In its latest ad campaign, created by BETC Paris, Heinz pays tribute to the virtuosos of tomato ketchup, who have been ignored for far too long

Latest News

Sep. 15, 2026

Embargo test

test embargo

Aug. 29, 2026

IKEA Sweden Cleans up its Act in New Outdoor Campaign

The storage boxes are filled with everything from toys to clothes, vintage records